Red October timber wagons delivered

United Wagon Co’s TikhvinSpetsMash plant has supplied 50 Type 13-6895 platform wagons to the Red October timber processing factory, which will use them transport logs and sawn wood.

Red October timber wagons delivered
TINNews

United Wagon Co’s TikhvinSpetsMash plant has supplied 50 Type 13-6895 platform wagons to the Red October timber processing factory, which will use them transport logs and sawn wood.

The wagons have 25 tonne axleloads and a capacity of 72·5 tonnes or 155 m3, a 30% to 40% increase on older designs. They are 19·5 m long over the couplers with a 18·85 m loading length, meaning transport costs can be calculated using short wheelbase tariffs, which UWC says ‘radically reduces’  transport costs per cubic metre of freight.

The wagons are designed for a service life of 40 years with box cassette bearings helping to provide an interval of 800 000 km or eight years between scheduled overhauls.

Source: railwaygazette

 

Send Comment