Electric locomotives handed over to Uzbekistan Railways
UZBEKISTAN: Two 3ES5K Yermak three-section 25 kV 50 Hz electric locomotives built at Transmashholding’s Novocherkassk plant in Russia were handed over to Uzbek national railway UTY on November 22.
UZBEKISTAN: Two 3ES5K Yermak three-section 25 kV 50 Hz electric locomotives built at Transmashholding’s Novocherkassk plant in Russia were handed over to Uzbek national railway UTY on November 22.
The 9·2 MW locomotives ordered in mid-2018 are intended to enable UTY to operate heavier trains in mountainous areas.
The NEVZ plant supplied VL60K and VL80S freight locomotives to Uzbekistan in the 1980s, and 10 TEP70BS diesel passenger locomotives were delivered by TMH’s Kolomna factory in 2007-12.
UTY’s post-Soviet fleet also incudes 49 electric locomotives supplied by CSR Zhuzhou and CNR Dalian in 2004-15.